Operations · 3 min · 637 words
Our winter moisture protocol, written out
Between November and March we change how the yard handles every incoming pallet. This is the actual procedure, including the parts that are inconvenient.

While it is fresh
Quote the thing you just read about
Mention the post in the message field and we will answer in the same terms it was written in.
Corrugated board is hygroscopic: it exchanges moisture with the air until it reaches equilibrium. In an Ohio winter that equilibrium moves twice a day, and the thing that destroys board is not cold — it is condensation on board that has been brought in from the cold too quickly.
The physics in two sentences
A pallet of boxes at 25°F brought into a 65°F building is below the dew point of the indoor air for somewhere between two and six hours. Water condenses on and inside the board during that time, and because the pallet is wrapped it cannot evaporate.
| Outside temp | Indoor dew point | Condensation window | Our action |
|---|---|---|---|
| Above 45°F | ~50°F | none | Normal intake |
| 32 – 45°F | ~50°F | 1 – 2 hours | Unwrap, stage 2 hours |
| 15 – 32°F | ~50°F | 3 – 5 hours | Unwrap, stage overnight |
| Below 15°F | ~50°F | 6+ hours | Stage overnight in the unheated bay |
The protocol
- Cut the stretch wrap at the dock, before the pallet comes inside. Trapped moisture is the entire problem and wrap is what traps it.
- Stage cold pallets in the unheated intake bay, not the grading floor. They acclimatise without condensing because the bay tracks outdoor temperature.
- Do not grade a cold pallet. Board below about 45°F reads stiffer than it is and graders systematically over-grade it. We have the records to prove we did this in our first two winters.
- Keep a hygrometer on each grading lane. Above 65% indoor relative humidity we stop taking new intake inside and work through what is already acclimatised.
- Outbound loads get wrapped at the last moment, not the night before.
What it means for your yard
If you store empties outdoors and we collect them in February, expect a grade lower than the photographs suggested — not because we are being difficult but because the board genuinely is weaker. The fix is almost free: get the stack under a roof, on a pallet, with four inches of air around it, and keep the stretch wrap off while it is in storage.
Customers who moved their empty storage indoors have seen our buy-back price rise by around 40%, which is the largest return on the cheapest change anybody in this market can make.
The equilibrium numbers, for reference
| Relative humidity | Board moisture | Compression strength |
|---|---|---|
| 30% | 5.5% | 108% of rated |
| 50% | 7.0% | 100% of rated |
| 65% | 9.0% | 88% of rated |
| 80% | 11.5% | 74% of rated |
| 90% | 14.0% | 62% of rated |
Two things to notice. First, the loss is continuous rather than a cliff — there is no safe threshold above which nothing happens. Second, dry board is actually stronger than its rating, which is why a box tested in a conditioned laboratory at 50% relative humidity is being measured under conditions your warehouse probably does not meet in July.
Recovery, and its limit
Humidity damage is reversible; liquid water damage is not. Board that has sat at 85% relative humidity for a week will recover most of its strength if it is brought back to 50% and allowed to equalise over several days. Board that has had standing water against it has lost the liner-to-flute bond, and no amount of drying restores that. The practical distinction a grader makes is whether the panel still sounds tight when pressed.
This is why our protocol is about preventing condensation rather than about avoiding cold. Cold board is fine. Cold board that warms up inside a wrapped pallet is how humidity damage becomes water damage, and that transition is the only irreversible step in the whole process.
end of post