Buying well · 4 min · 780 words
How we price a used box, line by line
A grade B 48×40×36 leaves our yard at $9.60. Here is every cent of that number, including the parts that are labour and the part that is profit.

While it is fresh
Quote the thing you just read about
Mention the post in the message field and we will answer in the same terms it was written in.
Packaging pricing is traditionally opaque, which suits suppliers and nobody else. We publish our build-up because the main objection to used board — "how do I know I am not being overcharged for somebody's rubbish" — is best answered with arithmetic.
| Line | Cost | Share | Note |
|---|---|---|---|
| Purchase from the generator | $3.10 | 32% | Paid per box, not per ton |
| Inbound freight | $1.15 | 12% | Usually a paired backhaul |
| Grading labour | $1.40 | 15% | ~7 seconds a box, fully loaded rate |
| Repair & consumables | $0.35 | 4% | Tape, corner boards, hot melt |
| Storage & handling | $0.60 | 6% | Building, forklifts, electricity |
| Loss on unsellable intake | $0.72 | 8% | The 6.6% we bale, spread across the rest |
| Overhead & admin | $1.18 | 12% | Eleven people, insurance, software |
| Margin | $1.10 | 11% | What the company actually keeps |
The two lines people are surprised by
The first is the loss line. We pay for every box we take in and then bale 6.6% of them at commodity rates, which is a real cost that has to live somewhere. Spreading it across the sellable boxes is the honest place to put it, and it is why a yard that grades loosely can appear cheaper — they are selling you the loss instead of absorbing it.
The second is grading labour at 15%. That is the entire value we add, and it is the reason we exist as a business rather than as a broker. Anybody can buy a trailer of mixed empties; knowing which 93.4% of them are worth selling is the job.
Why the purchase price is per box
Commodity recovered board trades per ton. Boxes as boxes trade per unit. Paying per ton for stock you intend to resell as boxes creates a perverse incentive: heavy, wet, delaminated board weighs more and pays better. We pay per box, by grade, which means the generator is rewarded for keeping their empties dry and square.
What we will not do
- We will not quote below $6.40 for a sellable box. Below that number somebody in the chain is being underpaid, usually the generator.
- We will not price grade C as grade B, even when stock is tight and the customer is in a hurry.
- We will not add a fuel surcharge on top of a quoted freight figure. The figure is the figure.
- We will not charge a restocking fee on our own grading mistakes, which is why the loss line exists.
If a competitor quotes you materially below this build-up, the interesting question is which line they removed. Occasionally the honest answer is overhead — a smaller operation genuinely has less. More often it is the loss line, and you will discover it on your dock.
How the same box prices in three other scenarios
| Scenario | Price | What changed |
|---|---|---|
| Standard grade B, stock size | $9.60 | baseline |
| Collected on a paired backhaul | $8.95 | inbound freight falls from $1.15 to $0.50 |
| Bought from a plant closure | $8.90 | purchase price falls, sorting risk rises |
| Managed supply, 6-month fixed | $9.20 | volume certainty lets us plan intake |
| Rush order, non-stock height | $12.40 | trim labour plus expedited freight |
The spread between the cheapest and most expensive version of an identical box is about 39%, and almost none of that is margin — it is freight and labour. This is why the single most useful thing a buyer can do is give us volume certainty and flexibility on timing. Both reduce our cost base and we pass it through, because an order we can plan is worth more to us than an order we have to scramble for.
What a competitor's lower quote usually means
- They are paying per ton rather than per box, which means their grade mix is whatever the weight gave them.
- They are not absorbing the loss on unsellable intake, so marginal board reaches you instead of the baler.
- They have no repair bench, so anything needing ten minutes of attention is sold as-is at a grade it does not merit.
- They are genuinely leaner — fewer people, smaller building, lower overhead. This is a legitimate reason and it happens.
We are not claiming every cheaper quote is suspect. We are saying that the build-up above is roughly what it costs to do this properly, and if a number is materially below it, the useful question is which line went missing rather than how they are so clever.
end of post